KOCHI METRO
RAIL LIMITED
Overview & Specifications

The Metro Project

Delivering a world-class integrated transit system for the citizens of Kochi through precision, innovation, and sustainable engineering.

Technical Specifications

  • Design Speed:90 km per hour
  • Average Speed:35 km per hour
  • Train Length:66.55 metres (3 coaches)

Operational Details

  • Completion Cost:Rs 5181.79 Crore
  • Fare Collection:Smart cards & RFID / QR Code tickets
  • Capacity/Train:975 passengers (Crush load)

Project Phases

Phase I

Aluva to Petta

Completed

Phase I Extensions

Petta to SN Junction (IA) & SN Junction to Thripunithura (IB)

Completed

Phase II

JLN Stadium to Infopark

Ongoing

Phase III

Aluva to Angamaly

Planned

Integrated Public Transport Map

Kochi Metro Integrated Map

Key Innovations

Social Inclusion

A unique aspect of Kochi Metro is the deployment of Kudumbasree members for managing operations. KMRL is also the first organization to appoint transgender persons in operations.

Solar Energy

Solar panels on the roofs of metro stations and ground-mounted panels at Muttom depot generate a combined capacity of 5.389MWp at zero cost to KMRL.

Vertical Gardens

Every station pillar features a vertical garden, utilizing biodegradable waste and watered using drip irrigation tied to the Swatchh Bharat Mission.

Metro Train Names

Our 25 trains are named after the sacred and prominent rivers of India.

KRISHNA (കൃഷ്ണ)
TAPTI (തപ്തി)
NILA (നിള)
SARAYU (സരയു)
ARUTH (അരുത്)
VAIGAI (വൈഗൈ)
JHANAVI (ജാഹ്നവി)
DHWANIL (ധ്വനിൽ)
BHAVANI (ഭവാനി)
PADMA (പത്മ)
MANDAKINI (മന്ദാകിനി)
YAMUNA (യമുന)
PERIYAR (പെരിയാർ)
KABANI (കബനി)
VAAYU (വായു)
KAVERI (കാവേരി)
SHIRIYA (ശിരിയ)
PAMPA (പമ്പ)
NARMADA (നർമദ)
MAHE (മാഹി)
MAARUT (മാരുത്)
SABARMATHI (സബർമതി)
GODHAVARI (ഗോദാവരി)
GANGA (ഗംഗ)
PAVAN (പവൻ)